Project Description

Great Court

  • Project: St James Road
  • Area: London
  • Contractor: Tide Construction
  • Contract value: £1.1m
  • Type: Labour, Plant and all Materials
  • Contract length: 5 Months, completed August 21

Great Court, Bermondsey is a new nine storey, 250 bed PBSA building with a cafe at ground floor, and internal student communal spaces at both the lower ground level and ground level. Built using the modular system with an external brick skin attached to the pod. All substructure work was undertaken as well as a large amount of blockwork internally to the basement and ground floor.